micro rotor

RAW Ornament 41mm

One time run of 20 numbered pieces

 1

participate in the creation of a unique timepiece

Be part of a unique and highly experimental design project. Together with 20 collectors we will commence on a journey to collaboratively create a one-time run of 20 timepieces. No more, no less. 

The project will be based on our RAW Ornament case design. The case that made our innovative 3D printing manufacturing process known and settled our recognizable design language among collectors worldwide. 

Especially for this project we adopted the iconic case one last time to house the most beautiful execution of the Vaucher 5401 micro-rotor caliber you have ever seen.

 1

The design project

As a collective, we will design a spectacular dial that will emphasize our collaborative values and love for watchmaking. The possibilities are almost endless, and we encourage any crazy ideas. To ensure the feasibility of the project and make sure the eventual design will match our design language, the project will be guided and curated by Michiel & Damiaen, as representatives of Holthinrichs Watches.

 1

Specifications of the project

Case: RAW Ornament

Case diameter: 41mm in diameter excluding crown. 

Case thickness: 7mm w/o crystal, 10mm including crystal. 

Case material: 3D printed stainless steel (or else if the group agrees upon). 

Dial: to be determined. 

Hands: to be determined. 

Movement: Vaucher 5401, re-engineered by Holthinrichs, featuring a brand new bridge design and extensive manual finishing. 

Target price € 18.900,- ex. VAT

(depending on final specifications and case material)

Financial breakdown. 

Buy-in to participate €2.500,- ex. VAT.

Fulfilment up until 50% upon ordering of movements. 

The remaining 50% at completion, before delivery of your timepiece.

-

Deposit will be refunded if we find insufficient participants.

Project timeline:

To commence the journey it is crucial we find 20 enthusiast collectors to make the project feasible. We will use November and December 2023 to form the group. Then the expected lead time is 12 months in which we define the project, produce technical documentation and manufacture and finish all components.

January 2024: Upon group completion: ordering Vaucher ebauches.

Januari 2024 Communal design process. 

Februari 2024 Production of technical drawings. 

March 2024 - August 2024 Manufacturing case, dial and hands. 

August 2024 Delivery of movements from Vaucher.

August 2024 - November 2024 Milling movement bridges and finishing of components. 

November 2024 Production of book.

December 2024 Assembly and delivery of the first timepieces.